The first super large LNG ship to be repaired in Mazhou island in 2020

Home > News > Industry news

  At 6:00 p.m. on August 17, the Hong Kong LNG carrier "Zhongneng Tianjin" slowly berthed at berth 9 of Mazhou island base under the guidance of the pilot. Xiong dengpan, deputy general manager of the company, Xu Fangxiong, general manager assistant and engineering manager, and members of the project team held a short welcome ceremony at the wharf.


  The main dimensions of the ship are 290.0m x 45.6m, cargo tank capacity: 174000m3, tank type: GTT No.96, driven by electric double main engines, with repair period of 22 days. The main works include conventional dock repair, ballast water treatment system upgrading, and equipment maintenance of low temperature system.